Testing standards before processing computer gongs
Processing before testing standards:
1. minute, the scanner after each minute to complete, first copy the coordinates of a few good jobs, cleared and re-inspected once the center are the same distance from both sides to ensure the points, the scanner correct.
2. optional knife, put the knife, the knife, the Z-axis coordinate copy number. According to the programming list to choose the right tool, pre-installed with the knife blade should thoroughly clean winded Tsui, installed after a good knife to use calibration tool to check there is no deflection. After knife scanner to re-inspection
Check once, to avoid the wrong knife, scanner wrong to bring significant losses.
3. transfer program started processing: under the knife to be used before a single execution, the transmission speed and feed rate was adjusted to the slowest, slow under the knife, watching the machine to display the Z-axis margin to check for abnormalities, such as abnormal immediately press the pause button and look for the original
Resolve anomalies due to confirm everything is normal after transferred to the appropriate speed to start processing.
4. process, should always observe the process without exception, there is no tool wear and tool wear serious to suspend Brothers, ensure that the processing is normal.